The Lochaber Water Power Scheme was started in the mid-1920s and completed in the 1940s.
The best source is The Puggy Line The Lochaber Narrow Gauge Railway Patrick Howat ISBN 978-0955432606
I have used this book along with various other sources to write this.
A temporary hydro-electric power station was built at Monessie in the Spean valley. A large dam was built across Loch Laggan and this fed Loch Treig through a 3½ mile rock tunnel. Loch had a small dam to raise the level of the loch and fed the smelter at Fort William through a 15 mile tunnel. This did not go ‘through Ben Nevis’ as is sometimes claimed.