The tunnels were built in the 1970s as a hardened cable run to carry telecommunications.
The tunnels are in use today and consists of three shafts and one lift shift outside Stadium House.
Additional information about the construction: Cardiff Cable Tunnel (James, NA), Post Office Electrical Engineers Journal - Vol 73 P177-183 (1980)